Sales of apartments in stage B have started — last available 2+kk units. The show apartment is open every Thursday from 3 to 6 p.m. The Quick change stage is complete — see the before and after photos. Free mortgage advice with every apartment reservation.
A street in Nová Šestka after the first works, visualisation

Revitalisation phase · Q1/2027

Quick change

The first changes you will see straight away. Quick change is the opening phase. It does not wait for building permits or material deliveries and focuses on what can be done right now: washing facades and roofs, tidying up around the buildings, brightening entrances, adding parking spaces and filling in the missing amenities. The streets change character before construction itself even begins.

Choose your apartment+
01

Cleaning facades, roofs and surroundings

A worker pressure washing the facade of a residential building

Facades and roofs are pressure washed, fallen render is made good and cracks repaired. The building looks cared for straight away, even before insulation begins.

A brightened building entrance with a paved path

Overgrown shrubs by the entrances and along the pavements are cut back so the path to the building is visible along its whole length. This is a quick fix at the most problematic spots, not the full greenery scheme.

02

Brightening entrances and pavements

03

Extra parking spaces

A newly marked car park between residential buildings

On paved areas where no major construction is needed, several dozen new spaces are created. Capacity rises immediately, without waiting for the courtyards to be rebuilt.

Benches, a bin and a covered container bay

We are adding the small amenities the streets lack: benches by the entrances, litter bins, bike racks and covered container bays. Bins disappear from the pavements and there is somewhere to sit down.

04

Benches, bins and container bays

Done
Q1/2027
Quick change
Not done
Q1/2027
Greenery management under CPTED
More information+
Not done
Q2/2027
Subsidy applications
More information+
Not done
Q3/2027
Revitalisation of common areas
More information+
Not done
Q4/2027–Q4/2028
Comprehensive insulation works
More information+
Not done
Q1/2028
Local amenities action plan
More information+
Not done
Q1/2028
PR strategy
More information+
Not done
Q2/2028–Q2/2029
Transformation of outdoor spaces
More information+
Not done
Q2/2029
Energy rating B
More information+
Not done
2030+
New development
More information+
Not done
Q2/2030
Šestka alive
More information+

Contact our agent

603 453 705

info@novasestka.cz

Martin Lepka
Martin Lepka
Real estate agent

For more information, please contact our agent