The first changes you will see straight away. Quick change is the opening phase. It does not wait for building permits or material deliveries and focuses on what can be done right now: washing facades and roofs, tidying up around the buildings, brightening entrances, adding parking spaces and filling in the missing amenities. The streets change character before construction itself even begins.
Choose your apartment+
Facades and roofs are pressure washed, fallen render is made good and cracks repaired. The building looks cared for straight away, even before insulation begins.
Overgrown shrubs by the entrances and along the pavements are cut back so the path to the building is visible along its whole length. This is a quick fix at the most problematic spots, not the full greenery scheme.
On paved areas where no major construction is needed, several dozen new spaces are created. Capacity rises immediately, without waiting for the courtyards to be rebuilt.
We are adding the small amenities the streets lack: benches by the entrances, litter bins, bike racks and covered container bays. Bins disappear from the pavements and there is somewhere to sit down.
For more information, please contact our agent