Sales of apartments in stage B have started — last available 2+kk units. The show apartment is open every Thursday from 3 to 6 p.m. The Quick change stage is complete — see the before and after photos. Free mortgage advice with every apartment reservation.
A lit street after the greenery works, after dark, visualisation

Revitalisation phase · Q1/2027

Greenery management under CPTED

Green surroundings where you feel good even after dark. The spaces between the buildings are managed under the internationally recognised CPTED approach, which demonstrably improves safety through carefully considered, clear sightlines. You can see the playground safely from your window, the way home stays visible throughout, and patches of grass become well-kept places to relax.

Choose your apartment+
01

Greenery you can see through

Courtyard with mature trees and low shrubs

We keep the shrub layer low and tree crowns lifted to let as much light through as possible. Mature trees are carefully preserved so they provide natural shade through the summer months.

Two children walking along a pavement between residential buildings

Building entrances, pavements and nearby stops are all clearly visible from the apartments and from the street. You and your children move through a space that is safe, open and overlooked at all times.

02

A safe way home

03

A place to rest

A maintained lawn in the courtyard with benches

Neglected patches are turned into well-kept spaces with maintained lawns, trees and benches. The result is a proper place to relax, one you will actually want to sit down in.

A refurbished building with a lawn and flower beds by the entrances

It is immediately clear where the public street ends and where the grounds belonging to your building begin. A cared-for space naturally encourages community life and discourages uninvited visitors.

04

Well-kept surroundings

Done
Q1/2027
Quick change
More information+
Not done
Q1/2027
Greenery management under CPTED
Not done
Q2/2027
Subsidy applications
More information+
Not done
Q3/2027
Revitalisation of common areas
More information+
Not done
Q4/2027–Q4/2028
Comprehensive insulation works
More information+
Not done
Q1/2028
Local amenities action plan
More information+
Not done
Q1/2028
PR strategy
More information+
Not done
Q2/2028–Q2/2029
Transformation of outdoor spaces
More information+
Not done
Q2/2029
Energy rating B
More information+
Not done
2030+
New development
More information+
Not done
Q2/2030
Šestka alive
More information+

Contact our agent

603 453 705

info@novasestka.cz

Martin Lepka
Martin Lepka
Real estate agent

For more information, please contact our agent